This checklist records an approved non-production disaster-recovery exercise. It is not evidence that a drill has happened. Use it with the region failover planning runbook and backup/restore procedures.

← Deployment and operations | Launch readiness

Current capability boundary

The repository deploys one Azure region. Geo-redundant PostgreSQL backups and GRS storage do not provision a recovery environment, restore databases, validate DNS/TLS, or meet an RTO/RPO by themselves. The database audit chain exists; Azure WORM storage does not. The bundled Shamir splitter is a non-production placeholder and cannot be used as an escrow ceremony.

A regional exercise is blocked until operators separately provision an isolated target, networking/DNS/TLS, secret/key access, storage access, and an approved platform-database pg_restore procedure.

Candidate drill types

Cadences below are readiness proposals and become requirements only after the Platform Owner, Security Lead, and recovery owners approve them.

Type Destructive? Evidence
Tabletop No Roles, assumptions, decision log, blockers
Tenant restore plan No by default tenant restore_drill result and job row
Isolated tenant restore Yes, drill target only Archive/key IDs, transcript, data/host smoke
Platform restore Yes, drill target only Decrypt, pg_restore, platform health, metadata checks
Regional rehearsal Yes, isolated region Infrastructure record, platform-first restore, tenants, TLS/DNS, worker cutover
Escrow rehearsal Only approved non-production material Approved implementation, custodians, fingerprint, reseal/rotation

Pre-drill safety gate

Execution

From app/, collect the read-only snapshot:

bin/cake platform_health --json
bin/cake dr_preflight --freshness-hours 24 --json
bin/cake tenant restore_drill --tenant <test-tenant> --lookback-hours 36

dr_preflight checks platform health, backup-row freshness, and queued/running jobs. It reports WORM configuration but does not include it in the pass result and does not prove archive decryptability, object retention, storage immutability, recovery infrastructure, DNS, or RTO/RPO.

Then:

  1. Record platform and tenant backup IDs, types, completion times, hashes, retention metadata, and separately controlled recovery-key references.
  2. Restore platform metadata first using the external decrypt/pg_restore process in backup/restore.
  3. Restore selected tenant databases only after platform metadata is healthy.
  4. Validate at least two tenant hosts plus an unknown host with correct TLS/SNI.
  5. Validate login, lookup, authorization workflows, documents, queue processing, and safe email behavior.
  6. Validate database audit continuity and, only if provisioned, the external immutable/WORM control.
  7. Enable the unified worker/schedules in exactly one region.
  8. Exercise rollback/failback decision points and capture elapsed time and backup age.
  9. Close with a retro, owners, dates, and a fresh Go/no-go recommendation.

Evidence

Item Required state
Scenario, exact targets, roles, approvals Complete before destructive work
Preflight output Restricted and redacted; exceptions owned
Image digest and migration state Exact values recorded
Platform .pgdump.enc and key reference Hash/age/retention recorded
Tenant .json.gz.enc and key reference Hash/age/retention recorded
Restore transcript Timestamped, redacted, target-specific
Tenant/TLS/host smoke Known hosts correct; unknown host denied
Worker/schedule proof Exactly one authority
Audit/WORM evidence Database chain verified; external immutability separately verified if claimed
RTO/RPO measurement Actual elapsed time and recovery-point age, not estimates
Actions Owner, severity, due date, retest

Launch interpretation